Don't Let Initiation Failures Cost You
Fracturing initiation is the critical first step in bringing a well online. A single failure can derail production, drive up expenses, and turn a high-potential project into a financial drain. NexGen knows the risks operators face when initiation doesn’t go as planned.
The Cost of Unreliable Initiation
When the first stage fails, the entire well is at risk. Here’s how it impacts production and bottom lines.
Restricted Flow: Poor execution can cause premature closure, limiting recovery and reducing overall output.
Unplanned Well Interventions: Malfunctioning or stuck retrievable tools require additional runs, increasing service costs and delays.
Formation Damage: Poor execution can stress the rock, cutting into production rates and requiring additional remediation.
Less production, more expenses, and extended delays all add up to lost profits and wasted time.
The NexStep DTI Advantage
NexGen’s Dissolvable Toe Initiator (DTI) delivers controlled activation, eliminating mechanical failures and unnecessary interventions. Designed for cemented and uncemented wells, it eliminates retrieval steps and reduces formation stress, setting the stage for a reliable and controlled start.
100% Success Rate: Proven performance in both cemented and uncemented applications.
Eliminating toe prep means frac starts sooner - creating faster production and more for the bottom line.
Formation Protection: Controlled initiation reduces formation stress, leading to higher productivity and fewer long-term issues.
Eliminate Uncertainty at the Toe
Failures at the toe compromise production and drive up costs. NexGen’s DTI delivers a field-proven, engineered solution that removes unnecessary risks, prevents delays, and keeps wells on schedule.
Contact NexGen today to learn how the DTI can transform your well development strategy.